The steel structure has begun to rise on the rear portion of our building, with the rest of the structure to follow throughout the winter and early spring. We anticipate “topping off” our steel in May.
Above photo, left: Structural steel rising on the rear of the building (facing Rockwell Place). Right: Looking down at the foundation as it is prepared for its acoustic isolation slab.